Region: Puget Sound | Legislative District: 5 | Length: 0.00 mi. | FY 2023 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 69,949 | 13,214 | 83,163 |
Right of Way | 0 | 0 | 0 |
Construction | 587,879 | 111,054 | 698,933 |
Project Totals | $657,828 | $124,268 | $782,096 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
84.1% | 15.9% | 15% |
Grind and 2-inch Overlay of North Bend Way - West C/L to NW 8th St