Region: Northwest | Legislative District: 42 | Length: 0.00 mi. | FY 2023 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 47,619 | 69,511 | 117,130 |
Right of Way | 0 | 0 | 0 |
Construction | 352,381 | 514,383 | 866,764 |
Project Totals | $400,000 | $583,894 | $983,894 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
40.7% | 59.3% | 15% |
The travel lanes of Grover Street will be ground 2 inches deep and repaved. The cross-streets at intersections will be ground back approx. 100 feet for a clean transition. New signal loops will be installed at intersections