Region: Northwest   |   Legislative District: 42   |   Length: 0.00 mi. FY 2023 Arterial Preservation Program (APP)

Existing Conditions

Project Funding

  TIB Funds Local Funds Total Costs
Design 47,619 69,511 117,130
Right of Way 0 0 0
Construction 352,381 514,383 866,764
Project Totals $400,000 $583,894 $983,894

Local Match

TIB Participation Local Match Minimum Local Match
40.7% 59.3% 15%

Description of Improvements

The travel lanes of Grover Street will be ground 2 inches deep and repaved. The cross-streets at intersections will be ground back approx. 100 feet for a clean transition. New signal loops will be installed at intersections