Region: Northwest | Legislative District: 40 | Length: 0.00 mi. | FY 2023 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 39,583 | 7,227 | 46,810 |
Right of Way | 0 | 0 | 0 |
Construction | 435,416 | 79,494 | 514,910 |
Project Totals | $475,000 | $86,720 | $561,720 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
84.6% | 15.4% | 15% |
Overlay with 2 inches