Region: Puget Sound | Legislative District: 31 | Length: 0.00 mi. | FY 2023 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 31,875 | 5,625 | 37,500 |
Right of Way | 0 | 0 | 0 |
Construction | 246,597 | 43,518 | 290,115 |
Project Totals | $278,472 | $49,143 | $327,615 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 10% |
Full depth reclamation with a 2-inch overlay