Region: Northeast | Legislative District: 9 | Length: 0.00 mi. | FY 2023 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 11,318 | 1,997 | 13,315 |
Right of Way | 0 | 0 | 0 |
Construction | 553,932 | 97,753 | 651,685 |
Project Totals | $565,250 | $99,750 | $665,000 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 15% |
Grind/haul 2 inch HMA from ex curb/gutter (w. side) to fog line or periodic curb/gutter (e. side); 26 ft typ mill width, widens to 40 ft near intersections. Surface prep, spot repair as needed, overlay w/2 inch HMA, restripe, and other incidental work.