Region: Northwest | Legislative District: 39 | Length: 0.00 mi. | FY 2023 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 8,500 | 1,500 | 10,000 |
Right of Way | 0 | 0 | 0 |
Construction | 205,909 | 36,336 | 242,245 |
Project Totals | $214,409 | $37,836 | $252,245 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 15% |
Plane existing asphalt along curb lines and end transitions, full width 2-inch aspahlt overly, adjust structure covers to finish grade, pavement markings and update three curb ramps to current ADA standards.