|
|
||||
Region: Southeast | Legislative District: 8 | Length: 0.00 mi. | FY 2022 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 6,800 | 1,200 | 8,000 |
Right of Way | 0 | 0 | 0 |
Construction | 222,377 | 39,243 | 261,620 |
Project Totals | $229,177 | $40,443 | $269,620 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 15% |
2-inch Overlay