City of West Richland
FY 2022 Overlay Project
Multiple Locations
TIB Award Amount
$229,177
Region: Southeast   |   Legislative District: 8   |   Length: 0.00 mi. FY 2022 Arterial Preservation Program (APP)

Existing Conditions

Project Funding

  TIB Funds Local Funds Total Costs
Design 6,800 1,200 8,000
Right of Way 0 0 0
Construction 222,377 39,243 261,620
Project Totals $229,177 $40,443 $269,620

Local Match

TIB Participation Local Match Minimum Local Match
85.0% 15.0% 15%

Description of Improvements

2-inch Overlay