Region: Northwest | Legislative District: 39 | Length: 0.00 mi. | FY 2022 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 8,670 | 1,530 | 10,200 |
Right of Way | 0 | 0 | 0 |
Construction | 154,590 | 27,280 | 181,870 |
Project Totals | $163,260 | $28,810 | $192,070 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 10% |
Taper grind from existing curbs to 8', overlay with HMA 2 inches thick for entire 36' wide pavement section on Wicker Road from Township Street to east city limits (1,182 lineal feet).