City of Kelso
FY 2022 Overlay Project
Multiple Locations
TIB Award Amount
$500,000
Region: Southwest   |   Legislative District: 19   |   Length: 0.00 mi. FY 2022 Arterial Preservation Program (APP)

Existing Conditions

Project Funding

  TIB Funds Local Funds Total Costs
Design 82,463 27,537 110,000
Right of Way 0 0 0
Construction 417,537 139,431 556,968
Project Totals $500,000 $166,968 $666,968

Local Match

TIB Participation Local Match Minimum Local Match
75.0% 25.0% 10%

Description of Improvements

Pavement repair, grind and inlay. Reconstruct existing sidewalk ramps to comply with ADA, adjust manhole frames and water valve boxes to grade, replace pavement markings, replace traffic loops