Region: Southwest | Legislative District: 19 | Length: 0.00 mi. | FY 2022 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 82,463 | 27,537 | 110,000 |
Right of Way | 0 | 0 | 0 |
Construction | 417,537 | 139,431 | 556,968 |
Project Totals | $500,000 | $166,968 | $666,968 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
75.0% | 25.0% | 10% |
Pavement repair, grind and inlay. Reconstruct existing sidewalk ramps to comply with ADA, adjust manhole frames and water valve boxes to grade, replace pavement markings, replace traffic loops