City of Grandview
FY 2022 Overlay Project
Multiple Locations
TIB Award Amount
$307,456
Region: Southeast   |   Legislative District: 15   |   Length: 0.00 mi. FY 2022 Arterial Preservation Program (APP)

Existing Conditions

Project Funding

  TIB Funds Local Funds Total Costs
Design 29,070 3,230 32,300
Right of Way 0 0 0
Construction 278,386 30,932 309,318
Project Totals $307,456 $34,162 $341,618

Local Match

TIB Participation Local Match Minimum Local Match
90.0% 10.0% 10%

Description of Improvements

Grind and Overlay 2"