Region: Southeast | Legislative District: 15 | Length: 0.00 mi. | FY 2022 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 29,070 | 3,230 | 32,300 |
Right of Way | 0 | 0 | 0 |
Construction | 278,386 | 30,932 | 309,318 |
Project Totals | $307,456 | $34,162 | $341,618 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
Grind and Overlay 2"