Region: Southwest | Legislative District: 19 | Length: 0.00 mi. | FY 2021 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 44,791 | 8,048 | 52,839 |
Right of Way | 0 | 0 | 0 |
Construction | 470,209 | 84,482 | 554,691 |
Project Totals | $515,000 | $92,530 | $607,530 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
84.8% | 15.2% | 10% |
Pavement repair, 2 inch grind and 2 inch HMA overlay