Region: Northeast | Legislative District: 13 | Length: 0.00 mi. | FY 2021 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 78,831 | 8,759 | 87,590 |
Right of Way | 0 | 0 | 0 |
Construction | 578,102 | 64,234 | 642,336 |
Project Totals | $656,933 | $72,993 | $729,926 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
The project grinds and provides a two-inch inlay including upgrade of ADA ramps, pavement repair and crack seal where needed.