City of Ridgefield
FY 2021 Overlay Project
Multiple Locations
TIB Award Amount
$500,000
Region: Southwest   |   Legislative District: 18   |   Length: 0.00 mi. FY 2021 Arterial Preservation Program (APP)

Existing Conditions

Project Funding

  TIB Funds Local Funds Total Costs
Design 76,085 19,178 95,263
Right of Way 0 0 0
Construction 423,915 106,853 530,768
Project Totals $500,000 $126,031 $626,031

Local Match

TIB Participation Local Match Minimum Local Match
79.9% 20.1% 15%

Description of Improvements

2 inch overlay