Region: Southwest | Legislative District: 18 | Length: 0.00 mi. | FY 2021 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 76,085 | 19,178 | 95,263 |
Right of Way | 0 | 0 | 0 |
Construction | 423,915 | 106,853 | 530,768 |
Project Totals | $500,000 | $126,031 | $626,031 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
79.9% | 20.1% | 15% |
2 inch overlay