Region: Southwest | Legislative District: 20 | Length: 0.00 mi. | FY 2021 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 42,840 | 4,760 | 47,600 |
Right of Way | 0 | 0 | 0 |
Construction | 328,456 | 36,494 | 364,950 |
Project Totals | $371,296 | $41,254 | $412,550 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
Grind and overlay existing pavement, replace non-compliant ADA ramps.