Region: Southwest | Legislative District: 20 | Length: 0.00 mi. | FY 2021 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 81,630 | 9,070 | 90,700 |
Right of Way | 0 | 0 | 0 |
Construction | 625,905 | 69,545 | 695,450 |
Project Totals | $707,535 | $78,615 | $786,150 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
Perform a 2-inch grind and overlay of the existing pavement, roadway striping, and replacement of existing ADA ramps.