|
|
||||
Region: Puget Sound | Legislative District: 31 | Length: 0.00 mi. | FY 2021 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 12,750 | 2,250 | 15,000 |
Right of Way | 0 | 0 | 0 |
Construction | 121,234 | 21,394 | 142,628 |
Project Totals | $133,984 | $23,644 | $157,628 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 15% |
2" grind and overlay of existing HMA. Existing curb and sidewalk to remain. Upgrade two existing ADA ramps to current standards.