Existing Conditions

Project Funding

  TIB Funds Local Funds Total Costs
Design 12,750 2,250 15,000
Right of Way 0 0 0
Construction 121,234 21,394 142,628
Project Totals $133,984 $23,644 $157,628

Local Match

TIB Participation Local Match Minimum Local Match
85.0% 15.0% 15%

Description of Improvements

2" grind and overlay of existing HMA. Existing curb and sidewalk to remain. Upgrade two existing ADA ramps to current standards.