City of Lynden
FY 2021 Overlay Project
Multiple Locations
TIB Award Amount
$501,687
Region: Northwest   |   Legislative District: 42   |   Length: 0.00 mi. FY 2021 Arterial Preservation Program (APP)

Existing Conditions

Project Funding

  TIB Funds Local Funds Total Costs
Design 71,521 32,587 104,108
Right of Way 0 0 0
Construction 430,166 195,996 626,162
Project Totals $501,687 $228,583 $730,270

Local Match

TIB Participation Local Match Minimum Local Match
68.7% 31.3% 15%

Description of Improvements

Work will involve grinding 2 inches of existing asphalt, paving 2 inches of HMA and the replacement of 8 non-compliant ADA ramps.