Region: Northwest | Legislative District: 42 | Length: 0.00 mi. | FY 2021 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 71,521 | 32,587 | 104,108 |
Right of Way | 0 | 0 | 0 |
Construction | 430,166 | 195,996 | 626,162 |
Project Totals | $501,687 | $228,583 | $730,270 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
68.7% | 31.3% | 15% |
Work will involve grinding 2 inches of existing asphalt, paving 2 inches of HMA and the replacement of 8 non-compliant ADA ramps.