City of Grandview
FY 2021 Overlay Project
Multiple Locations
TIB Award Amount
$239,715
Region: Southeast   |   Legislative District: 15   |   Length: 0.00 mi. FY 2021 Arterial Preservation Program (APP)

Existing Conditions

Project Funding

  TIB Funds Local Funds Total Costs
Design 27,630 3,070 30,700
Right of Way 0 0 0
Construction 212,085 23,565 235,650
Project Totals $239,715 $26,635 $266,350

Local Match

TIB Participation Local Match Minimum Local Match
90.0% 10.0% 10%

Description of Improvements

This project includes planing the roadway, applying crack seal, and overlaying Stover Road between East Stover Road to Coleen Way before restriping. Minor adjustments to utilities include manholes and valve boxes. The City is also including installation of six ADA compliant ramps and minimal associated curb and gutter.