City of Fircrest
FY 2021 Overlay Project
Multiple Locations
TIB Award Amount
$574,447
Region: Puget Sound   |   Legislative District: 28   |   Length: 0.00 mi. FY 2021 Arterial Preservation Program (APP)

Existing Conditions

Project Funding

  TIB Funds Local Funds Total Costs
Design 63,450 7,050 70,500
Right of Way 0 0 0
Construction 510,997 56,778 567,775
Project Totals $574,447 $63,828 $638,275

Local Match

TIB Participation Local Match Minimum Local Match
90.0% 10.0% 10%

Description of Improvements

This project grinds and provides a 2-inch overlay and upgrades 4 ADA ramps.