Region: Puget Sound | Legislative District: 28 | Length: 0.00 mi. | FY 2021 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 63,450 | 7,050 | 70,500 |
Right of Way | 0 | 0 | 0 |
Construction | 510,997 | 56,778 | 567,775 |
Project Totals | $574,447 | $63,828 | $638,275 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
This project grinds and provides a 2-inch overlay and upgrades 4 ADA ramps.