Region: Southeast | Legislative District: 16 | Length: 0.00 mi. | FY 2021 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 45,360 | 5,040 | 50,400 |
Right of Way | 0 | 0 | 0 |
Construction | 242,534 | 26,949 | 269,483 |
Project Totals | $287,894 | $31,989 | $319,883 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
Grind and overlay full road width and length of described segement. Replace non-ADA compliant ramps and sidewalks. Estimate includes line-item to anticipate additional costs associated with construction during non-standard working hours.