Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 02/12/2024 Audit 0.00 0.00 0.00 0.00 0.00 0.00 46,584.00 46,584.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 46,584.00 46,584.00