Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/22/2021 Payment 0.00 0.00 0.00 0.00 0.00 0.00 25,729.98 25,729.98
2 07/12/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 22,636.93 22,636.93
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 48,366.91 48,366.91