Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 12/14/2022 Payment 0.00 0.00 0.00 0.00 0.00 0.00 24,243.43 24,243.43
2 06/09/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 48,137.15 48,137.15
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 72,380.58 72,380.58