Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 05/22/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 18,132.25 18,132.25
2 12/02/2024 Audit 0.00 0.00 0.00 0.00 0.00 0.00 7,065.75 7,065.75
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 25,198.00 25,198.00