Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 06/08/2023 Payment 0.00 0.00 9,109.47 0.00 0.00 0.00 0.00 9,109.47
2 08/02/2023 Payment 0.00 0.00 4,394.00 0.00 0.00 0.00 100,277.73 104,671.73
3 10/31/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 31,265.33 31,265.33
4 04/15/2024 Audit 0.00 0.00 4,045.18 0.00 5,147.84 0.00 6,525.45 15,718.47
TOTAL PAYMENTS 0.00 0.00 17,548.65 0.00 5,147.84 0.00 138,068.51 160,765.00