Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/27/2021 Payment 0.00 0.00 0.00 0.00 0.00 0.00 325,221.10 325,221.10
2 02/15/2024 Audit 0.00 0.00 33,940.79 0.00 62,210.04 0.00 -79,033.93 17,116.90
TOTAL PAYMENTS 0.00 0.00 33,940.79 0.00 62,210.04 0.00 246,187.17 342,338.00