Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 02/22/2023 Payment 0.00 0.00 41,272.64 0.00 0.00 0.00 0.00 41,272.64
2 12/14/2023 Audit 0.00 0.00 -10,009.14 0.00 39,028.33 0.00 329,708.17 358,727.36
TOTAL PAYMENTS 0.00 0.00 31,263.50 0.00 39,028.33 0.00 329,708.17 400,000.00