Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/22/2023 Payment 0.00 0.00 26,235.03 0.00 0.00 0.00 0.00 26,235.03
2 10/24/2023 Payment 0.00 0.00 17,854.10 0.00 1,807.19 0.00 43,259.77 62,921.06
3 12/18/2023 Payment 0.00 0.00 0.00 0.00 31,532.53 0.00 196,560.24 228,092.77
4 03/15/2024 Audit 0.00 0.00 314.19 0.00 26,900.24 0.00 5,510.71 32,725.14
TOTAL PAYMENTS 0.00 0.00 44,403.32 0.00 60,239.96 0.00 245,330.72 349,974.00