Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 03/08/2022 Payment 0.00 0.00 20,342.42 0.00 0.00 0.00 0.00 20,342.42
2 08/01/2022 Payment 0.00 0.00 56,016.62 0.00 0.00 0.00 0.00 56,016.62
3 12/28/2022 Payment 0.00 0.00 0.00 0.00 11,625.39 627.48 0.00 12,252.87
4 02/07/2023 Payment 0.00 0.00 0.00 0.00 28,540.92 0.00 231,816.37 260,357.29
5 07/17/2023 Audit 0.00 0.00 -0.04 0.00 -0.31 -627.48 18,579.63 17,951.80
TOTAL PAYMENTS 0.00 0.00 76,359.00 0.00 40,166.00 0.00 250,396.00 366,921.00