Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/24/2023 Payment 0.00 0.00 0.00 0.00 6,076.41 0.00 72,112.45 78,188.86
2 01/16/2024 Payment 0.00 0.00 0.00 0.00 7,716.21 0.00 25,249.88 32,966.09
3 05/01/2024 Audit 0.00 0.00 0.00 0.00 421.07 0.00 9,225.98 9,647.05
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 14,213.69 0.00 106,588.31 120,802.00