Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/07/2022 Payment 0.00 0.00 35,280.00 0.00 0.00 0.00 0.00 35,280.00
2 01/02/2024 Payment 0.00 0.00 45,843.75 0.00 0.00 0.00 0.00 45,843.75
TOTAL PAYMENTS 0.00 0.00 81,123.75 0.00 0.00 0.00 0.00 81,123.75