Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 01/29/2024 Payment 0.00 0.00 0.00 0.00 0.00 13,407.48 224,820.22 238,227.70
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 13,407.48 224,820.22 238,227.70