Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 05/09/2023 Payment 0.00 0.00 25,032.50 0.00 0.00 0.00 0.00 25,032.50
2 10/03/2023 Payment 0.00 0.00 335.92 0.00 0.00 0.00 255,005.13 255,341.05
3 03/21/2024 Payment 0.00 0.00 0.00 0.00 16,639.93 0.00 33,962.72 50,602.65
4 11/14/2024 Audit 0.00 0.00 -348.57 0.00 3,728.65 0.00 14,039.72 17,419.80
TOTAL PAYMENTS 0.00 0.00 25,019.85 0.00 20,368.58 0.00 303,007.57 348,396.00