Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 02/09/2023 Payment 0.00 0.00 25,501.06 0.00 0.00 0.00 0.00 25,501.06
2 03/16/2023 Payment 0.00 0.00 13,003.94 0.00 0.00 0.00 0.00 13,003.94
3 08/11/2023 Payment 0.00 0.00 -5,261.78 0.00 17,948.00 0.00 0.00 12,686.22
4 11/07/2023 Payment 0.00 0.00 5,261.78 0.00 20,557.00 0.00 287,755.70 313,574.48
5 06/03/2024 Audit 0.00 0.00 3,169.92 0.00 -1,378.21 651.26 16,756.33 19,199.30
TOTAL PAYMENTS 0.00 0.00 41,674.92 0.00 37,126.79 651.26 304,512.03 383,965.00