Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/15/2024 Payment 0.00 0.00 0.00 0.00 1,459.12 3,137.35 136,802.71 141,399.18
2 09/10/2024 Payment 0.00 0.00 0.00 0.00 846.89 727.11 37,069.98 38,643.98
3 10/23/2024 Payment 0.00 0.00 0.00 0.00 501.60 768.55 75,476.77 76,746.92
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 2,807.61 4,633.01 249,349.46 256,790.08