| Bill # | Payment Date | Type | Predesign | Spec. Study | DE Engr. | Right of Way | CN Engr. | CN Other | CN Contract | Total |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 07/08/2019 | Payment | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 600,000.00 | 600,000.00 |
| 2 | 02/26/2020 | Payment | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 5,000.00 | 5,000.00 |
| TOTAL PAYMENTS | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 605,000.00 | 605,000.00 | ||