Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 02/27/2017 Payment 0.00 0.00 0.00 0.00 0.00 0.00 188,000.00 188,000.00
2 07/19/2017 Payment 0.00 0.00 0.00 0.00 0.00 0.00 62,000.00 62,000.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 250,000.00 250,000.00