Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 02/07/2024 Payment 0.00 0.00 0.00 0.00 55,107.01 43,748.32 469,079.39 567,934.72
2 03/15/2024 Payment 0.00 0.00 0.00 0.00 20,018.97 13,420.68 226,893.99 260,333.64
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 75,125.98 57,169.00 695,973.38 828,268.36