Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 02/20/2024 Payment 0.00 0.00 0.00 0.00 5,894.15 103,169.98 0.00 109,064.13
2 03/25/2024 Payment 0.00 0.00 0.00 0.00 8,710.46 0.00 41,211.64 49,922.10
3 04/29/2024 Payment 0.00 0.00 0.00 0.00 7,622.75 286.72 105,236.19 113,145.66
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 22,227.36 103,456.70 146,447.83 272,131.89