Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/11/2023 Payment 0.00 0.00 49,042.17 0.00 0.00 0.00 0.00 49,042.17
2 11/20/2023 Payment 0.00 0.00 7,925.12 0.00 0.00 0.00 0.00 7,925.12
3 12/14/2023 Payment 0.00 0.00 9,053.04 0.00 0.00 0.00 0.00 9,053.04
4 01/11/2024 Payment 0.00 0.00 12,637.10 0.00 0.00 0.00 0.00 12,637.10
TOTAL PAYMENTS 0.00 0.00 78,657.43 0.00 0.00 0.00 0.00 78,657.43