Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/13/2023 Payment 0.00 0.00 242,600.63 0.00 0.00 0.00 0.00 242,600.63
2 01/10/2024 Payment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 04/29/2024 Payment 0.00 0.00 -80,908.70 0.00 0.00 0.00 271,198.99 190,290.29
TOTAL PAYMENTS 0.00 0.00 161,691.93 0.00 0.00 0.00 271,198.99 432,890.92