Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 01/17/2023 Payment 0.00 0.00 1,949.29 0.00 0.00 0.00 0.00 1,949.29
2 02/06/2024 Payment 0.00 0.00 0.00 0.00 17,397.73 0.00 138,277.01 155,674.74
3 12/30/2024 Audit 0.00 0.00 -19.45 0.00 9,321.05 0.00 313,074.37 322,375.97
TOTAL PAYMENTS 0.00 0.00 1,929.84 0.00 26,718.78 0.00 451,351.38 480,000.00