Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 04/27/2023 Payment 0.00 0.00 186,472.60 0.00 46,918.49 0.00 107,922.16 341,313.25
2 07/25/2023 Payment 0.00 0.00 6,297.07 0.00 41,613.37 0.00 519,814.20 567,724.64
3 11/15/2023 Payment 0.00 0.00 2,006.46 0.00 15,962.81 0.00 243,077.94 261,047.21
4 02/18/2024 Payment 0.00 0.00 553.31 0.00 4,191.22 0.00 118,218.69 122,963.22
TOTAL PAYMENTS 0.00 0.00 195,329.44 0.00 108,685.89 0.00 989,032.99 1,293,048.32