Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 03/10/2023 Payment 0.00 0.00 0.00 0.00 5,431.92 0.00 0.00 5,431.92
2 06/01/2023 Payment 0.00 0.00 0.00 0.00 25,567.87 0.00 0.00 25,567.87
3 10/12/2023 Payment 0.00 0.00 0.00 0.00 81,478.70 0.00 409,329.49 490,808.19
4 02/01/2024 Payment 0.00 0.00 0.00 0.00 115,284.82 0.00 507,236.71 622,521.53
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 227,763.31 0.00 916,566.20 1,144,329.51