Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/13/2023 Payment 0.00 0.00 56,303.01 0.00 0.00 0.00 0.00 56,303.01
2 10/12/2023 Payment 0.00 0.00 0.00 0.00 8,393.24 0.00 194,873.29 203,266.53
3 12/27/2023 Payment 0.00 0.00 0.00 0.00 5,981.69 0.00 14,632.27 20,613.96
4 01/31/2024 Audit 0.00 0.00 -13,553.06 0.00 11,497.34 0.00 24,211.22 22,155.50
TOTAL PAYMENTS 0.00 0.00 42,749.95 0.00 25,872.27 0.00 233,716.78 302,339.00