Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 05/26/2021 Payment 0.00 0.00 2,863.55 0.00 0.00 0.00 0.00 2,863.55
2 06/30/2021 Payment 0.00 0.00 12,955.57 0.00 0.00 0.00 0.00 12,955.57
3 08/23/2021 Payment 0.00 0.00 1,453.49 0.00 0.00 0.00 0.00 1,453.49
4 10/31/2023 Audit 0.00 0.00 24,751.03 0.00 32,737.33 0.00 326,427.03 383,915.39
TOTAL PAYMENTS 0.00 0.00 42,023.64 0.00 32,737.33 0.00 326,427.03 401,188.00