Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/11/2023 Payment 0.00 0.00 10,317.52 0.00 0.00 0.00 0.00 10,317.52
2 11/20/2023 Payment 0.00 0.00 1,963.83 0.00 0.00 0.00 0.00 1,963.83
3 04/25/2024 Payment 0.00 0.00 36,862.84 0.00 0.00 0.00 0.00 36,862.84
TOTAL PAYMENTS 0.00 0.00 49,144.19 0.00 0.00 0.00 0.00 49,144.19