Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/11/2023 Payment 0.00 0.00 0.00 0.00 22,626.48 0.00 530,623.22 553,249.70
2 11/20/2023 Payment 0.00 0.00 0.00 0.00 55,496.40 0.00 69,773.35 125,269.75
3 01/02/2024 Audit 0.00 0.00 0.00 0.00 33,338.21 0.00 2,373.34 35,711.55
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 111,461.09 0.00 602,769.91 714,231.00