Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/21/2023 Payment 0.00 0.00 54,325.87 0.00 0.00 0.00 189,645.65 243,971.52
2 10/11/2023 Payment 0.00 0.00 0.00 0.00 4,639.43 0.00 270,166.50 274,805.93
3 01/03/2024 Payment 0.00 0.00 0.00 0.00 4,863.80 0.00 106,958.57 111,822.37
TOTAL PAYMENTS 0.00 0.00 54,325.87 0.00 9,503.23 0.00 566,770.72 630,599.82