Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 12/01/2020 Payment 0.00 0.00 27,000.00 0.00 44,100.00 0.00 128,900.00 200,000.00
2 12/01/2020 Audit 0.00 0.00 0.00 0.00 0.00 0.00 177,181.00 177,181.00
TOTAL PAYMENTS 0.00 0.00 27,000.00 0.00 44,100.00 0.00 306,081.00 377,181.00